X
Feb 25, 2021 05:41 PM (GMT+8) · EqualOcean
Recently, the bidding results of the joint centralized bidding project of China Tower and China Telecom's lithium iron phosphate battery for standby power have been announced. The five enterprises winning the bid are linkage Tianyi, Nandu power, Zhongtian Technology, Shuangdeng group and Yipeng energy. The winning shares are about 849.5mwh for linkage Tianyi, 591.5mwh for Nandu power, 349mwh for Zhongtian Technology, 200mwh for Shuangdeng group and 100mwh for Yipeng energy. This is the same as that in the bidding announcement, "the number of successful bidders is 5, and the winning share of the first successful bidder reaches 40%, while the winning share of the second to the fifth is 28%, 17%, 10% and 5% respectively." It doesn't make much difference.